What aspects should be paid attention to the cap in summer--ASME B16.9 316 Seamless Butt Welding Stainless Steel Pipe Cap,Pipe Cap

Pipe Elbow
Pipe Tee
Pipe Reducer
Pipe Cap
Pipe Bend
Seamless Steel Pipe
ERW Steel Pipe
Weld Neck Flange
Slip On Flange
Blind Flange
Forged fitting

 

· What aspects should be paid attention to the cap in summer
· Technical requirements for stainless steel pipe elbow
· Market forecast of large diameter carbon steel flanges
· The types of ERW Steel Pipe
· How to choose the material of stainless steel flange
· Manufacturing process of different diameter reducer
· The process of seamless steel pipe
· Effect of lubrication on product quality during pipe bend process

 

Location:HOME  »  NEWS
NEWS
What aspects should be paid attention to the cap in summer
Source :admin   Time:7/16/2018 10:05:18 PM   hit:

  After the production of the pipe cap is completed, we must have some methods to preserve and maintain it for better application in the future. The maintenance and maintenance of pipe caps should start with the placement of the head, and make sure that the heads are not stored in the open air, but also to avoid rain.

  The next is the cleaning of the ASME B16.9 316 Seamless Butt Welding Stainless Steel Pipe Cap, and can not be used to clean the pipe cap with hydrochloric acid and other reductive acids. The correct cleaning method should be stainless steel acid cleaning. When the pipe cap and the hermaphrodite welding, it is necessary to clean the weld, the heat affected zone and the surrounding slag, spatter, and contaminants, and carry out PT inspection and surface pickling.

  In addition to the above, we should also pay attention to avoid scratching and scratching on the surface of the head, so as to avoid iron pollution. Only these basic operations can be regarded as standard maintenance of pipe caps. The place or warehouse for storing pipe caps should be selected in a clean and well drained place away from factories or mines that produce harmful gases or dust. Weeds and all sundries should be cleared on the site, and the head is kept clean. In the warehouse, it should not be stacked with acid, alkali, salt, cement and other corrosive materials for the pipe cap.

         Previous :Technical requirements for stainless steel pipe elbow
               Next:none
Friendly Links: carbon steel pipe fitting    steel shots    pipe fittings    carbon steel pipe fittings factory    Seamless Steel Pipe    steel pipe    valve    Butt welded elbow    shengtian pipe fitting    pipe fittings manufacturers    Butt weld pipe fitting    A234 wpb pipe fitting    steel seamless pip    accesorios de tubería    conexões    flanges    ANSI B16.9 weld neck flange     Фитинг    Screwed Fittings    steel flange    ERW pipes    manhole covers    steel grit    reeqlink   
Copyright ©Hebei Shengtian Pipe fittings Group Co.,Ltd.   
       Copyright ©Hebei Shengtian Pipe-fitting Group Co.,Ltd.     Email : sale@stpipefitting.cn 
 Add : Xiwang New District, Mengcun County,Hebei Province,ChinaSupport:boyikeji